Home | Research Applications | Equipment Information | Technical Info | Recipes | Policies | iLab |
---|
Operating hours: Monday - Friday from 8 AM - 5 PM
Cleanroom Status: Open with limitations under Orange Level 3
Equipment Status:
Affected instruments are listed below:
E-beam deposition (Class 10,000):
(Installation in progress) Working with Prof. Erik Henriksen to complete installation
Laser writer:
Do not use wafer centering with 10 mm head. An alternate method is available to perform the same task.